CASE STUDY · MODERNISATION
Legacy system modernization without betting the business on a big-bang rewrite.
Illustrative scenario · Sector: Enterprise software, financial services, manufacturing and SaaS · Solution partner: Brandsmashers Tech
- 6 → 2 wksTarget release cycle within 12 months
- 14 → 8Target production incidents per quarter
01 · PROJECT OVERVIEW
Old technology is not the real problem.
Legacy applications often remain at the heart of critical business operations. The problem is not simply that the technology is old.
The bigger problems are slow releases, hard integrations, tangled modules, thin test coverage and a shrinking pool of engineers who know the system. A complete rewrite may sound attractive, but it can introduce significant technical and business risk.
- Assessing architecture, dependencies and business-critical paths
- Choosing the highest-friction modules to modernise first
- Establishing APIs and extracting capabilities incrementally
- Improving CI/CD and measuring delivery and stability
- 1Slow release cycles and difficult integrations.
- 2High dependency between modules and limited test coverage.
- 3Production incidents, and few engineers familiar with the system.
02 · THE CHALLENGE
A monolith that resists change.
Consider a 10-year-old Java monolith with a 6-week release cycle, 14 production incidents per quarter and 8 high-change modules. Instead of rewriting everything, the strategy targets the two domains creating the greatest business and engineering friction.
- PROBLEM 01Six-week release cycle
Every change waits for a large, coordinated release, so the business waits too.
- PROBLEM 0214 incidents a quarter
Changes in one module break others, and fixes are slow to ship.
- PROBLEM 03Eight high-change modules
A few parts of the system absorb most of the change and most of the risk.
- PROBLEM 04Big-bang rewrite risk
Replacing everything at once would freeze features for years and put critical operations at risk.
Modernize what is slowing the business, not everything at once.
03 · THE APPROACH
Six steps, one domain at a time.
Incremental modernisation keeps the business running while the parts that hurt most are changed first.
- 01Architecture assessment
Understand dependencies, traffic, modules and business-critical paths.
- 02Identify candidates
Find the high-change, high-risk or high-value components to start with.
- 03Establish APIs
Create clear interfaces between the existing system and new components.
- 04Extract incrementally
Move selected capabilities without disrupting the entire platform.
- 05Improve CI/CD
Introduce automated testing and deployment pipelines.
- 06Measure
Track release frequency, incidents, recovery time and change failure.
- 1→Assess
- 2→Pick two domains
- 3→APIs
- 4→Extract
- 5→Automate
- 6Measure
04 · RESULTS
The 12-month target.
The objective is a platform that is easier to change, without adding complexity it doesn’t need.
| METRIC | BASELINE | TARGET |
|---|---|---|
| Release cycle | 6 weeks | 2 weeks |
| Production incidents | 14 per quarter | 8 per quarter |
| High-change modules | 8, all in the monolith | 2 extracted first |
| Deployment | Large monolith | Bounded services |
| Strategy | Big-bang | Incremental |
This is a framework-based illustrative scenario; the figures are modeled targets, not client results. Financial, operational and client-specific outcomes require validation.
- 2 weeksRelease cycleFrom 6 weeks.
- 8Production incidents per quarterFrom 14.
- 2 of 8High-change modules extracted firstThe two domains with the most friction.
- 12 monthsTimeframeIncremental, with the platform running throughout.
- Faster releases
Smaller, independent deployments instead of one large release.
- Fewer incidents
Clear interfaces and automated tests contain the impact of change.
- Lower risk
No big-bang cut-over; each step is reversible and measured.
- A platform that can keep changing
The same approach extends to the next domains.
05 · DELIVERABLES
How Brandsmashers would build it.
- Architecture assessmentDependency, traffic and module analysis of the existing system.
- API layerClear interfaces between the legacy core and new components.
- Incremental extractionStrangler-pattern migration of the highest-friction domains.
- CI/CD and testingAutomated tests and deployment pipelines.
- Delivery metricsRelease frequency, incidents, recovery time and change failure, tracked.
- Platforms
- Java.NETDatabases
- Architecture
- APIsModularisationEvent-driven architectureStrangler pattern
- Cloud
- ContainerisationCloudDatabase modernisation
- Delivery
- DevOpsCI/CDAutomated testing
TAKEAWAYS
Why Brandsmashers.
- 01Start with the modules that change most and hurt most.
- 02Put APIs around the old system before taking it apart.
- 03Extract incrementally and keep the business running.
- 04Measure release speed and stability, not lines migrated.
- Financial services
- Manufacturing
- Enterprise software
- SaaS
- Insurance
YOUR TURN
Modernising a legacy system?
Brandsmashers provides modernisation engineers across Java, .NET, cloud, APIs, DevOps, databases and application architecture.