01 · PROJECT OVERVIEW

The client and the brief.

An anonymised SaaS startup. Name withheld under confidentiality.

A managed Kubernetes cluster, infrastructure as code, automated CI/CD, autoscaling and monitoring.

WHAT THE CLIENT WAS DEALING WITH
  1. Deployments were a manual process that depended on one or two people being available.
  2. Each release was slow and stressful.
  3. Environments had drifted apart, so a change that worked in staging could behave differently in production.
  4. At peak load, the application timed out.
  5. The founders were about to sign larger customers and knew the platform would not cope.

02 · WHAT WENT WRONG

What went wrong, and how we fixed it.

Every engagement hits problems. These were the ones that mattered here, and what we changed so they did not come back.

  • PROBLEM 01In an early load test, autoscaling worked but the application still timed out

    New pods started quickly, yet the database ran out of connections because each pod opened its own pool. The cluster scaled up and took the database down with it.

  • PROBLEM 02We found it by watching the database metrics during the test, not just the application ones

    The fix had three parts: smaller pools per pod, a connection pooler in front of the database, and a cap on maximum replicas until the database could cope. We repeated the test until it passed cleanly. The lesson stayed with the team: scale the whole path, not one layer.

  • PROBLEM 03The lesson stayed with the team: scale the whole path, not one layer
  • PROBLEM 04After the first production deploy through the new pipeline, one service failed to start because a secret had been set by hand in the old environment and never recorded

    The deploy rolled back cleanly, which was the point of the setup. We moved all secrets into a managed store, referenced from code, and added a check that fails a build if a required secret is missing.

03 · THE PROCESS

How we ran it.

We worked in short stages so the team always had something usable.

  1. 01
    Assessment

    we reviewed the application, its dependencies and the manual deploy steps. We wrote the steps down, since many only existed in people's memory.

  2. 02
    Foundation

    infrastructure as code for networking, the cluster and supporting services. A second environment was built from the same code to prove it was repeatable.

  3. 03
    Pipeline and migration

    automated build, test and deploy, then services moved to the cluster one at a time.

  4. 04
    Scale and harden

    autoscaling, monitoring, load tests and a handover to the client's engineers.

We took part in the client's standup, and held a weekly demo of working changes.

04 · RESULTS

What changed.

Measured against the way the work ran before the engagement began.

  • NOW 01

    Any engineer can deploy, because the process is automated and documented.

  • NOW 02

    Staging and production come from the same code, so surprises are rare.

  • NOW 03

    Load tests run before major launches and big customer onboardings.

  • NOW 04

    Infrastructure changes go through review like application changes.

  • 2

    Deploys down from a 2-hour manual process to 15 minutes

  • No peak-load timeouts in load tests

  • Environments reproducible from code

05 · WHAT WE BUILT

How it works.

  • A managed Kubernetes service removed the burden of running the control plane.
  • Everything else, including networks, cluster settings, secrets handling and deployments, was defined in code and kept in version control.
  • A pull request was the only way to change infrastructure.
  • The pipeline built a container image, ran tests and scans, and deployed to staging automatically.
  • Promotion to production used the same artefact and needed one approval.
  • Rollback was a single command to redeploy the previous version.
AFTER LAUNCH
What went wrong, part two
After the first production deploy through the new pipeline, one service failed to start because a secret had been set by hand in the old environment and never recorded. The deploy rolled back cleanly, which was the point of the setup. We moved all secrets into a managed store, referenced from code, and added a check that fails a build if a required secret is missing.
Controls
Cluster access was granted by role and logged. Images were scanned in the pipeline. Production changes needed review and one approval, and every change was traceable to a commit.
Handover
We ran two sessions with the client's engineers: one on day-to-day deploys, one on cluster upgrades and recovery. They rebuilt a test environment from code during the second session without our help.

06 · QUICK ANSWERS

The short version.

What problem did the client have?
Deployments were a manual process that depended on one or two people being available. Each release was slow and stressful. Environments had drifted apart, so a change that worked in staging could behave differently in production. At peak load, the application timed out. The founders were about to sign larger customers and knew the platform would not cope.
What did Brandsmashers build?
A managed Kubernetes cluster, infrastructure as code, automated CI/CD, autoscaling and monitoring.
How was the work run?
We worked in short stages so the team always had something usable.
What were the results?
Deploys down from a 2-hour manual process to 15 minutes; no peak-load timeouts in load tests; environments reproducible from code.

YOUR TURN

Have a similar requirement?

Tell us what is stuck. We will come back with a plan and matched, pre-vetted engineers.

NEXT CASE STUDYStanding up a dedicated SRE pod that hit 99.9% uptime in 90 days